黄片三级中文字幕在线观看_久久综合久久鬼色_亚洲永久韩国久久_99视频免费观看网站

DC engineering
±500kV Yihua Line anti-dancing renovation project

宜華線.jpg

The ±500kV Yihua HVDC transmission line starts from Yidu Converter Station in Yichang, Hubei province, and ends at Huaxin Converter Station in Shanghai. The total length of the line is 1,075 km, and the transmission capacity is 300 MW, which is the main artery of the three Gorges Project.

電 話
產(chǎn) 品
短 信
聯(lián) 系